Mv Polydefkis at Paldiski South harbour

Another bulk carrier carrying wind turbine blades (36 pieces) has arrived at Paldiski South Harbour. Mv Polydefkis, 229 meters in length, is being discharged for the first time at berths 4 & 5 using our two mobile harbor cranes, Gottwald and Liebherr.

This is the final batch for the Sopi-Tootsi wind farm, which will comprise a total of 38 turbines with a combined capacity of 255 MW.